The School Building Authority funded the East Hardy Elementary/Middle School in early 1991. Work with the building design committee had started six months prior to funding and construction proceeded quickly with a Site Work contract.
As a requirement of SBA, East Hardy Elementary/Middle School was built using Construction Management procedures. The project was bid and constructed under eighteen separate packages of work.
A hillside site resulted in a two-story, five level building that is totally accessible. The major design challenge was providing a single structure while maintained separation of elementary and middle school students.
Students: 585 (K-4, 5-8)
Building Size: 76,500 SF
Project Cost: $5,100,000.00
Building Cost: $53.30/SF
Completion Date: 1992
|