Mildred Mitchell-Bateman Hospital Renovations - BIDDING
Huntington, WV
BID DATE CHANGED: August 13, 2008 at 1:30 pm
Mandatory Pre-Bid Meeting: July 8, 2008; 10:00 AM
in the Conference Room of Mildred Mitchell-Bateman Hospital
Requests for Quotations may be obtained by contacting:
WV Department of Administration
Purchasing Division
2019 Washington Street
Charleston, WV 25305
Phone: 304-558-2063
or download the WV State RFQ in PDF format (1.1 Mb - 19 pages)
SCOPE-OF-WORK
The Work includes renovation to miscellaneous buildings on campus as
follows:
- Building Two:
- Upgrade electrical service.
- Remove and replace elevator.
- Minor renovations in Basement and First Floor.
- Complete renovation and build-out of Second and Third Floor
to create patient rooms and common areas. Work includes
power, data, phone, fire alarm, plumbing and HVAC.
- Installation of sprinkler system throughout entire building.
- Remove and replace all windows in entire building.
- Masonry restoration as detailed.
- Provide new chiller and boiler and associated work to serve
the entire building, connecting to existing hot and chilled water
systems.
- Provide new water heating systems and revise existing hot
and cold water piping mains in basement.
- Provide new generator to supply required emergency power.
- Provide DDC Control System.
- Building Three:
- Remove and replace all existing windows.
- Extend DDC Control System from Building Two.
- Building Four:
- Provide new generator to supply emergency power to the
existing boiler. (To be sized for future supply of required
emergency lighting and power.)
- Extend DDC Control System from Building Two
WEST VIRGINIA DEPARTMENT OF HEALTH AND HUMAN RESOURCES
Pinecrest Hospital - Nurse Call / Fire Alarm - BID
Beckley, West Virginia
BID - November 8, 2007 at 1:30 pm
Mandatory Pre-Bid Meeting: 10/17/2007; 11:00 a.m
- Project officially awarded to Summit Electric of Hurricane, WV
WEST VIRGINIA DEPARTMENT OF HEALTH AND HUMAN RESOURCES
Mildred Mitchell-Bateman Hospital
Huntington, West Virginia

Additional Projects:
35 Bed Patient Unit Renovations to Building Two
Estimated Cost: $4,000,000.00
Work includes renovation of approximately 20,000 sq. ft., window replacement, elevator replacement and health/safety upgrades.
Approximate Bid Date: To be announced shortly
|