Under Construction

November 19, 2008

November 12, 2008

November 7, 2008

October 31, 2008

October 22, 2008

 

October 17, 2008

 

October 8, 2008

Project Description

The Work includes removal and replacement of interior non-load bearing ceilings, doors/frames, walls and floors and associated finishes and accessories as required for pyritic remediation/stabilization work (this includes electrical and plumbing work), exterior re-caulking of all existing windows, and the creation of weep-holes in the brick veneer. The exterior work includes re-grading and paving the parking areas, sidewalk replacement, and a storm-water collection system. Other work includes removal of the existing ballasted roof and replacing with an EPDM system, and replacement of the existing roof mounted HVAC units.

Graphics and renderings below are for demonstrative purposes only and are not part of the bid documents.

Proposed Work

View 3D Animations

Lobby Study Animation

View 3D animation in Windows Media Player format

 

Proposed Work Animation

View 3D animation in Windows Media Player format

Examples of Existing Conditions