hits |
May 22, 2009






April 14, 2009



April 8, 2009


April 1, 2009





March 18, 2009



March 4, 2009




February 18, 2009




February 11, 2009




February 5, 2009

January 28, 2009

January 23, 2009





January 14, 2009


December 30, 2008



December 17, 2008






December 12, 2008 - Video (Windows Media Player)

December 12, 2008



December 3, 2008



November 19, 2008 - Video (Windows Media Player)

November 19, 2008



November 12, 2008




November 7, 2008

October 31, 2008



October 22, 2008








October 17, 2008



October 8, 2008









The Work includes removal and replacement of interior non-load bearing ceilings, doors/frames, walls and floors and associated finishes and accessories as required for pyritic remediation/stabilization work (this includes electrical and plumbing work), exterior re-caulking of all existing windows, and the creation of weep-holes in the brick veneer. The exterior work includes re-grading and paving the parking areas, sidewalk replacement, and a storm-water collection system. Other work includes removal of the existing ballasted roof and replacing with an EPDM system, and replacement of the existing roof mounted HVAC units.
Graphics and renderings below are for demonstrative purposes only and are not part of the bid documents.

Lobby Study Animation

View 3D animation in Windows Media Player format
Proposed Work Animation

View 3D animation in Windows Media Player format



 |
 |